Initial consultation

  •  Review your power needs, looking at each motor's horsepower, air conditioning tonnage, heater kilowatts, etc.
  •  Assess your natural gas/propane line to confirm proper sizing of both piping, regulator and meter.
  •  Assess the best location(s) for your generator and transfer switch and, review fire hazards, noise restrictions, setback rules, etc.
  •  Measure distance for wire and fuel lines.

Generator Install

  •  Pouring a concrete pad
  •  Generator (installed)
  •  Transfer switch (installed)
  •  Natural gas piping - price includes a run of up to 20' with no obstructions
  •  Conduit/wiring - price includes a run of up to 20' with no obstructions
  •  Battery (installed)
  •  Start-up by a factory-trained dealer